Services, Projects, Photo Gallery

IMG_8788.jpg
IMG_8576.jpg
IMG_0530.JPG

New Unit Installation

Technical Direction of Planned Outages

Operations and Maintenance

Some of Our Recent Projects for Our Clients

Construction Services
DJI_0006.00_01_01_01.Still006-01.jpeg

AKSA Power Plant 370MW

Wartsila Engines

Scope: Erection of Engine Hall, Wartsila engines, BOP Piping and Step-up Substation

Client: AKSA

Year: 2017/2018

1.JPG

Amandi Power Plant 200MW

General Electric Frame 9E.04

Scope: Erection of BOP equipment and BOP piping

Client: METKA

Year: 2018

DJI_0078.JPG

Ameri Power Plant 250MW

10x TM2500 General Electric Gas Turbines

Scope: Erection of complete electromechanical equipment (10x General Electric TM2500)

Client: METKA

Year: 2015

Bridge Power Plant 400MW

5x TM2500 General Electric Gas Turbines

Scope: 5x General Electric TM2500 exhaust and 161kV Substation Mechanical Erection works

Client: METKA

Year: 2019

DJI_0830.JPG

Kekeli Power Plant 65MW

Siemens SGT800

Scope: Balanced of Plant Piping, Steam Turbine, Air-Cooled Condenser, thermal insulation mechanical erection works

Client: TSK

Year: 2020-2022

Commissioning Services
1.JPG

Amandi Power Plant 200MW

1x General Electric Frame 9E.04

Scope: Mechanical commissioning Services

Date: 2018-2022

Client: METKA

DJI_0078.JPG

Bridge Power Plant 400MW

5x General Electric TM2500

Scope: Mechanical Commissioning Services

Date: 2019-2022

Client: METKA

Operation and Maintenance
IMG-20200722-WA0021 (4).jpg
O&M.jpg

Ameri Power Plant 250MW

10x TM2500 General Electric Gas Turbines

Scope: Operation and Maintenance of 10x General Electric TM2500

Client: METKA

Year: 2015- 2020

DJI_0078.JPG
Screenshot (526).png

Bridge Power Plant 400MW

5x TM2500 General Electric Gas Turbines

Scope: 5x General Electric TM2500 preservation works

Client: METKA

Year: 2018

Ghana Power Generation Company

2x General Electric LM6000

Scope: Mechanical equipment preservation works

Client: GPGC

Year: 2018-Ongoing

Power Plant Outage Services
1.jpg
hasman-0997.JPG

Cenpower Plant 330MW

2x General Electric Frame 9E Gas Turbines

Scope: Combustion Inspection on Gas turbine

Client: Ethos Energy

Year: 2022

CENIT Power Plant 110MW

General Electric Frame 9E Gas Turbine

Scope: Hot Gas Path Inspection, Combustion Inspection works

Client: CENIT

Year: 2019/2021